Microsoft Douglasville Data Center Campus

MicrosoftDouglasville, Douglas County, GAUpdated

Microsoft is building a data center in Douglas County, Georgia (under construction). One source reports this facility in the Kapwork Grow tracker.

Site
160 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. ~2 yr ago

    Construction start

  3. ~3 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
MicrosoftOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 271619018347871

Scale

Site area
160 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 271619018347871

Reported dates

Announced
2024-01Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga
Construction start reported
2024-06Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga

Site

City
DouglasvilleCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga
County
DouglasCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga
State
GeorgiaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 271619018347871

Power and cooling

Utility
Georgia PowerUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 271619018347871
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 271619018347871
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 6, 2026 · Record: microsoft-douglasville-ga

Permits and public records

Incentives reported
Development Authority of Douglas County property-tax abatement (a county official confirmed Microsoft is enrolled in an incentive program; amount and term are not in the public record), plus Georgia's statewide data-center sales-and-use tax exemption (the state does not disclose company-level amounts) (Douglas County / Georgia)Incentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 271619018347871

Sources, method and limits

Show 8 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasMicrosoft Douglasville Data Center CampusUnder constructionNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 6, 2026 · Record: microsoft-douglasville-ga
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. CA
  9. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Microsoft Douglasville Data Center Campus”, https://kapwork.com/grow/directory/datacenters/microsoft-douglasville-data-center-campus-ga-dc_f7093b1a555f, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.