Microsoft Maiden Data Center
Microsoft is building a data center in Catawba County, North Carolina (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Site
- 292 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Microsoft builds
Operator
Microsoft
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 6 mo ago
Construction start
- 6 mo ago
Event date: · First observed: Not reported
- ~4 yr ago
Announced
Reported updates without an event date
Reported for 2022-11.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasEPA EPA facility registryKW Kapwork Grow tracker record
Status
- Operator
- Microsoft
- Stage
- Under construction
- Facility type
- Hyperscale
Scale
- Site area
- 292 acres
Reported dates
- Announced
- 2022-11
- Construction start reported
- 2026-03-02Reported date — see the source for the event evidenced.
Site
- City
- Maiden
- County
- Catawba
- State
- North Carolina
- Location precision
- Site footprint confirmed
Permits and public records
- EPA air permit
- 80% Synthetic Minor Emissions
- EPA compliance status
- No Violation Identified
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Microsoft Maiden Data Center | Under construction | Not reported |
| EPA ECHO | Microsoft Corporation, CLT10 | Operating | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 15, 2026 · Record: microsoft-maiden-catawba-county-nc
- CAData Center Frontier (cited by Compute Atlas)As of: Aug 15, 2026
- CACatawba County, NC (cited by Compute Atlas)As of: Aug 15, 2026
- CAGo Foothills (cited by Compute Atlas)As of: Aug 15, 2026
- EPAEPA Facility Registry (ECHO) record (US government, public domain)As of: Sep 24, 2026 · Record: 110071813306
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 234466443186238
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · US EPA Facility Registry Service via ECHO (public domain). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Microsoft Maiden Data Center”, https://kapwork.com/grow/directory/datacenters/microsoft-maiden-data-center-nc-dc_d53ef90ed03e, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
- Amazon Web Services (AWS) Richmond County CampusNorth Carolina
- Amazon Web Services Richmond County Data Center CampusNorth Carolina
- American Tower Reedy Creek Data Center (East Charlotte)North Carolina
- Compass Statesville CampusNorth Carolina
- Deep River Data AI Data Center (Cumnock, Lee County)North Carolina
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.