Data center buildProposed2 of 2 datasets agree

Oakland University Campus Computing Facility

Fairmount Properties (with Oakland University)Auburn Hills, Oakland County, MIUpdated

Fairmount Properties (with Oakland University) has proposed a 26 MW data center in Oakland County, Michigan (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
26 MW
Reported jobs
30

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Fairmount Properties (with Oakland University)

  • Utility

    DTE Energy

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 7 mo ago

    Announced

  3. 7 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
2, all agree
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Fairmount Properties (with Oakland University)Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-miOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-miStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 275206916177631

Scale

Reported capacity
26 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-miReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945
Reported jobs
30Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 275206916177631

Reported dates

Announced
2026-02-19Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945Reported date — see the source for the event evidenced.

Site

City
Auburn HillsCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-miCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945
County
OaklandCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-miCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945
State
MichiganState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-miState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0945
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 275206916177631

Power and cooling

Utility
DTE EnergyUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 275206916177631
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 275206916177631

Sources, method and limits

Show 3 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasOakland University Campus Computing FacilityProposed26 MW
Server CountryOakland University Campus Computing FacilityProposed26 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: oakland-university-computing-auburn-hills-mi
  2. CA
  3. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0945
  4. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Oakland University Campus Computing Facility”, https://kapwork.com/grow/directory/datacenters/oakland-university-campus-computing-facility-mi-dc_fa4c9a7a7edf, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds