Skip to content
Data center buildProposed2 datasets report

Patmos Fairfield Colocation Data Center

PatmosFairfield, Jefferson County, ALUpdated

Patmos has proposed a 45 MW data center in Jefferson County, Alabama (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
45 MW
Expected completion
2027
Reported jobs
50

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Patmos

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. next year

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 2 mo ago

    Announced

  4. 2 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
2, figures differ
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
PatmosOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: patmos-fairfield-al
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: patmos-fairfield-alStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 255966617483866

Scale

Reported capacity
45 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883
Reported jobs
50Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 255966617483866

Reported dates

Announced
2026-07-16Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883Reported date — see the source for the event evidenced.
Expected completion
2027Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883

Site

City
FairfieldCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: patmos-fairfield-alCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883
County
JeffersonCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: patmos-fairfield-alCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883
State
AlabamaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: patmos-fairfield-alState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0883
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 255966617483866
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 255966617483866

Power and cooling

AI workload
Mixed use, AI among other workloadsAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 9, 2026 · Record: patmos-fairfield-al

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasPatmos Fairfield Colocation Data CenterProposedNot reported
Server CountryFairfield Colocation Data CenterProposed45 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: patmos-fairfield-al
  2. CA
  3. CA
  4. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0883
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Patmos Fairfield Colocation Data Center”, https://kapwork.com/grow/directory/datacenters/patmos-fairfield-colocation-data-center-al-dc_e8ccdf4f3a5a, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds