Project Kestrel
Shenandoah Computing LLC has approval for a data center in Platte County, Missouri (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Investment
- $100B
- Building area
- 1.8M sq ft (1,800,000 sq ft)
- Site
- 379 acres
- Reported jobs
- 50
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Shenandoah Computing LLC
Utility
Evergy
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- this year
Construction start
- Today
Approved
Last material change Sep 24, 2026.
- 13 mo ago
Announced
- 13 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2026.
Event date: Not reported · First observed: Not reported
Reported for 2025-08.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Shenandoah Computing LLC
- Stage
- Approved
- Facility type
- Enterprise
Scale
- Reported investment
- $100B
- Reported building area
- 1,800,000 sq ft
- Site area
- 379 acres
- Reported jobs
- 50
Reported dates
- Announced
- 2025-08-26Reported date — see the source for the event evidenced.
- Construction start reported
- 2026
Site
- City
- Kansas City
- County
- Platte
- State
- Missouri
- Location precision
- Street address reported
Power and cooling
- Utility
- Evergy
Permits and public records
- Incentives reported
- Grant; Infrastructure Support; $40,000,000
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Project Kestrel | Approved | Not reported |
| Server Country | Project Kestrel | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 10, 2026 · Record: shenandoah-project-kestrel-kc-northland-mo
- CAKSHB (cited by Compute Atlas)As of: Sep 10, 2026
- CAPort KC (cited by Compute Atlas)As of: Sep 10, 2026
- CABaxtel (cited by Compute Atlas)As of: Sep 10, 2026
- CAOpenStreetMap contributors (cited by Compute Atlas)As of: Sep 10, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0191
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 107365792739202
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Project Kestrel”, https://kapwork.com/grow/directory/datacenters/project-kestrel-mo-dc_61a60befef82, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.