Project Tembo
Google is building a 2700 MW data center in Laramie County, Wyoming (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 2700 MW
- Investment
- $50B
- Building area
- 3.08M sq ft (3,080,000 sq ft)
- Site
- 716 acres
- Expected completion
- 2031
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Google builds
Operator
Google
Utility
Black Hills Energy
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 5 yr
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 8 mo ago
Construction start
- 8 mo ago
Event date: · First observed: Not reported
- 14 mo ago
Announced
Reported updates without an event date
Reported for 2031.
Event date: Not reported · First observed: Not reported
Reported for 2026-07.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Tenants
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 2700 MW
- Reported investment
- $50B
- Reported building area
- 3,080,000 sq ft
- Site area
- 716 acres
- Reported jobs
- 400
Reported dates
- Announced
- 2025-07-24Reported date — see the source for the event evidenced.
- Construction start reported
- 2026-01-06Reported date — see the source for the event evidenced.
- Expected completion
- 2031
Site
- City
- Cheyenne
- County
- Laramie
- State
- Wyoming
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Black Hills Energy
- Power source
- On-site natural gas generation
- Cooling
- Closed loop
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- Incentives reported
- Sales Tax Exemption
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Project Tembo | Under construction | 2700 MW |
| Server Country | Google Project Tembo (formerly Crusoe/Tallgrass AI Data Center) | Under construction | 2700 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 2, 2026 · Record: tallgrass-project-jade-cheyenne-wy
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CACowboy State Daily (cited by Compute Atlas)As of: Jul 7, 2026
- CACowboy State Daily (cited by Compute Atlas)As of: Sep 2, 2026
- CAPOWER Magazine (cited by Compute Atlas)As of: Aug 7, 2026
- CAPower Engineering (cited by Compute Atlas)As of: Sep 2, 2026
- CAWyoFile (cited by Compute Atlas)As of: Sep 2, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0582
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 66719975226263
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Project Tembo”, https://kapwork.com/grow/directory/datacenters/project-tembo-wy-dc_3cae746c3b97, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.