Skip to content
Data center buildApproved

Prometheus Hyperscale Atlas Industrial Park Data Center Campus

Prometheus HyperscaleEvanston, Uinta County, WYUpdated

Prometheus Hyperscale has approval for a 1250 MW data center in Uinta County, Wyoming (approved). One source reports this facility in the Kapwork Grow tracker.

Capacity
1250 MW
Investment
$16B
Site
506 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Approved

    Last material change Sep 24, 2026.

  2. 4 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Prometheus HyperscaleOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
Stage
ApprovedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112

Scale

Reported capacity
1250 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
Reported investment
$16BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112
Site area
506 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112

Reported dates

Announced
2026-05Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy

Site

City
EvanstonCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
County
UintaCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
State
WyomingState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112

Power and cooling

Utility
PacifiCorpUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112
Power source
On-site natural gas generationPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112
Cooling
Closed loopCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy

Permits and public records

Incentives reported
Wyoming Data Center Sales Tax Exemption (Wyoming)Incentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 104752569490112

Sources, method and limits

Show 9 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasPrometheus Hyperscale Atlas Industrial Park Data Center CampusApproved1250 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: prometheus-hyperscale-evanston-wy
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. CA
  9. CA
  10. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Prometheus Hyperscale Atlas Industrial Park Data Center Campus”, https://kapwork.com/grow/directory/datacenters/prometheus-hyperscale-atlas-industrial-park-data-center-campus-wy-dc_5f459bb19ac0, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds