QTS York County Data Center Campus
QTS is building a data center in York County, South Carolina (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Investment
- $1B
- Site
- 173 acres
- Reported jobs
- 200
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other QTS builds
Operator
QTS
Utility
York Electric Cooperative
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- last year
Construction start
- ~3 yr ago
Announced
- ~3 yr ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2025.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasEPA EPA facility registryKW Kapwork Grow tracker record
Status
- Operator
- QTS
- Stage
- Under construction
- Facility type
- Colocation
Scale
- Reported investment
- $1B
- Site area
- 173 acres
- Reported jobs
- 200
Reported dates
- Announced
- 2023-09-19Reported date — see the source for the event evidenced.
- Construction start reported
- 2025
Site
- City
- Rockhill
- County
- York
- State
- South Carolina
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- York Electric Cooperative
- Power source
- Grid power
- Cooling
- Closed loop
Permits and public records
- EPA air permit
- No Classification In ICIS
- EPA compliance status
- No Violation Identified
- Incentives reported
- Coordinating Council for Economic Development Set-Aside grant (to York County for site preparation) (South Carolina) $200,000; Fee-in-Lieu of Tax (FILOT) agreement (York County, South Carolina)
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | QTS York County Data Center Campus | Under construction | Not reported |
| EPA ECHO | QTS CLT1 Campus | Operating | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 10, 2026 · Record: qts-york-county-sc
- CASouth Carolina Department of Commerce (cited by Compute Atlas)As of: Aug 26, 2026
- CAYork County, South Carolina (cited by Compute Atlas)As of: Aug 26, 2026
- CAOpenStreetMap (cited by Compute Atlas)As of: Aug 26, 2026
- CAQTS Data Centers (cited by Compute Atlas)As of: Sep 10, 2026
- EPAEPA Facility Registry (ECHO) record (US government, public domain)As of: Sep 24, 2026 · Record: 110072000256
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 239255208461282
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · US EPA Facility Registry Service via ECHO (public domain). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “QTS York County Data Center Campus”, https://kapwork.com/grow/directory/datacenters/qts-york-county-data-center-campus-sc-2-dc_d999f1b603e2, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.