Raeden Project Taurus
Raeden has approval for a 50 MW data center in El Paso County, Colorado (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 50 MW
- Investment
- $7
- Building area
- 451,217 sq ft
- Expected completion
- May 2027 (2027-05)
- IT load
- 50 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Raeden builds
Operator
Raeden
Utility
Colorado Springs Utilities
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 8 mo
Expected completionPlanned
- Today
Approved
Last material change Sep 24, 2026.
- 5 mo ago
Announced
Reported updates without an event date
Reported for 2027-05.
Event date: Not reported · First observed: Not reported
Reported for 2026-04.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Raeden
- Stage
- Approved
- Facility type
- AI data center
Scale
- Reported capacity
- 50 MW
- Reported IT load
- 50 MW
- Reported investment
- $7
- Reported building area
- 451,217 sq ft
Reported dates
- Announced
- 2026-04
- Expected completion
- 2027-05
Site
- City
- Colorado Springs
- County
- El Paso
- State
- Colorado
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- Colorado Springs Utilities
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Raeden Project Taurus | Approved | 50 MW |
| Server Country | Raeden Project Taurus | Proposed | 50 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 26, 2026 · Record: raeden-taurus-colorado-springs-co
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- CAReport cited by Compute AtlasAs of: Jul 26, 2026
- CAColorado Springs Gazette (cited by Compute Atlas)As of: Aug 26, 2026
- CAColorado Springs Gazette (cited by Compute Atlas)As of: Aug 26, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0650
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 88234487738034
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Raeden Project Taurus”, https://kapwork.com/grow/directory/datacenters/raeden-project-taurus-co-dc_503fb14c6eb2, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.