Skip to content
Data center buildProposed

Sanford Woods Industrial and Technical Campus

Randy GibbsSanford, York County, MEUpdated

Randy Gibbs has proposed a 300 MW data center in York County, Maine (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
300 MW
Investment
$2 ($2.16)

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Randy Gibbs

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 7 mo ago

    Announced

  3. 7 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
Randy GibbsOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 188700690083184

Scale

Reported capacity
300 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708
Reported investment
$2.16Reported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 188700690083184

Reported dates

Announced
2026-02-19Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708Reported date — see the source for the event evidenced.

Site

City
SanfordCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708
County
York CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708
State
MaineState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0708
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 188700690083184

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 188700690083184

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountrySanford Woods Industrial and Technical CampusProposed300 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0708
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Sanford Woods Industrial and Technical Campus”, https://kapwork.com/grow/directory/datacenters/sanford-woods-industrial-and-technical-campus-me-dc_ab9f4d99ed70, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds