  • data center

    DeepGreen Western Passage Subsea AI Data Center

    Proposed: a 15 MW data center in Washington County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

  • data center

    Green 4 Maine Data Center Campus

    Proposed: a 6 MW data center in Aroostook County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

  • data center

    Loring LiquidCool Data Center (Green 4 Maine Campus)

    Proposed: a 50 MW data center in Aroostook County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

  • data center

    Sanford Woods Industrial and Technical Campus

    Proposed: a 300 MW data center in York County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

  • data center

    Scarborough Technology Park Data Center

    Proposed: a data center in Cumberland County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

  • data center

    Wiscasset Data Center (Old Ferry Road Site)

    Proposed: a data center in Lincoln County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

  • data center

    Wiscasset Data Center (Proposed)

    Proposed: a 714 MW data center in Lincoln County, Maine, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

    Materially updated:

Coverage reflects the publisher’s records, not every company or project nationally. An announced or permitted build is not a contract, an open bid or a purchase order. Read each record’s sources, dates, and limitations before acting.