Data center buildProposed

TeraWulf Lake Hawkeye (Cayuga)

TeraWulfLansing, Tompkins County, NYUpdated

TeraWulf has proposed a 138 MW data center in Tompkins County, New York (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
138 MW
Investment
$4
Expected completion
Feb 2032 (2032-02)
IT load
320 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in ~5 yr

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 6 yr ago

    Construction start

  4. 7 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
TeraWulfOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 225535761217614

Scale

Reported capacity
138 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
Reported IT load
320 MWReported IT load · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 225535761217614
Reported investment
$4Reported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 225535761217614

Reported dates

Announced
2019Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
Construction start reported
2020Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
Expected completion
2032-02Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360

Site

City
LansingCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
County
Tompkins CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360
State
New YorkState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0360

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 225535761217614

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryTeraWulf Lake Hawkeye (Cayuga)Proposed138 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0360
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “TeraWulf Lake Hawkeye (Cayuga)”, https://kapwork.com/grow/directory/datacenters/terawulf-lake-hawkeye-cayuga-ny-dc_cd1fa2ee784e, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.