BEAD projectProvisional

360 Broadband · Oklahoma

Official project code: CM61-BEAD-OK-28-3184

360 BroadbandOklahomaUpdated

360 Broadband, LLC - 360 BEAD- Pittsburg County #2 (CM61-BEAD-OK-28-3184) is a broadband project record in Oklahoma. Recorded technology: Fixed Wireless. Reported award: not reported. Linked award holder: 360 Broadband.

Technology
Fixed Wireless
Planned completion
Jan 5, 2028 (2028-01-05)

Who's on this project

The award holder decides its own bids and subcontracts.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 16 mo

    Planned completionPlanned

  2. Today

    Provisional

    Last material change Sep 17, 2026.

  3. 2 mo ago

    Planned startPlanned

Record quality

Sources cited
1
Summary
From published records
Source as of
Last material change

Record details

NTIA NTIA federal reporting

Official project code
CM61-BEAD-OK-28-3184Official project code · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184
Project state or territory
OklahomaProject state or territory · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184
Reported award
Not reportedReported award · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184Reporting period: 2026-04-13
Planned service locations
Not reportedPlanned service locations · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184Reporting period: 2026-04-13
Recorded deployment technologies
Fixed WirelessRecorded deployment technologies · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184
Project award status
ProvisionalProject award status · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184
Planned start
2026-07-06Planned start · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184Planned date — not evidence that work occurred.
Planned completion
2028-01-05Planned completion · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184Planned date — not evidence that work occurred.

Description supplied by the source

360 Broadband LLC, in partnership with Trans-Tel Central, proposes the deployment of a fiber-to-the-premises (FTTP) network in Pittsburg County, Oklahoma—referred to as Pittsburg County #2. This BEAD-funded project will provide high-speed, reliable broadband service to 242 unserved and underserved locations across the county. The proposed design leverages a hybrid of aerial and underground fiber construction, covering approximately 81.68 miles of distribution fiber and 13.75 miles of service drops.\\n\\nThe GPON-based network will support symmetrical 1 Gbps service with a scalable path to 10 Gbps, ensuring long-term service quality and future upgrade capability. Approximately 95% of the deployment will utilize aerial fiber to reduce labor costs and expedite construction, while all buried segments will be installed in conduit to protect infrastructure and support future expansion.\\n\\nThis project represents a total estimated investment of $5,460,733.61, including construction, engineering, permitting, legal, and management costs. The project timeline anticipates a 12-month completion period, including design, permitting, make-ready work, construction, and closeout. All design and construction activities will adhere to BEAD and NTIA technical standards, with built-in redundancies and spare capacity to accommodate future growth.\\n\\n360 Broadband has developed a detailed pro forma financial analysis indicating long-term sustainability, with positive cash flow projected within four years and full alignment with BEAD performance and adoption benchmarks. By extending critical broadband infrastructure into historically underserved areas, this project will deliver transformational digital access to residents and anchor institutions across Pittsburg County.

Description supplied by the source · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184

Sources, method and limits

Show 1 sourceHide

Sources and evidence

  1. NTIA
    NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
  • Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.

Cite or correct this record

Kapwork Grow, “360 Broadband · Oklahoma”, https://kapwork.com/grow/directory/bead/projects/360-broadband-llc-360-bead-pittsburg-county-2-pr_5b49591e51f87828d33e, materially updated Sep 17, 2026.

Report an error in this record and we will check it against the cited sources.

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.