Skip to content
BEAD projectProvisional

AtLink Services, LLC · Oklahoma

Official project code: CM61-BEAD-OK-157-3159

AtLink Services, LLCOklahomaUpdated

AtLink Services - AtLink 1000 (CM61-BEAD-OK-157-3159) is a broadband project record in Oklahoma. Recorded technology: Fixed Wireless. Reported award: not reported. Linked award holder: AtLink Services, LLC.

Technology
Fixed Wireless
Planned completion
Feb 1, 2027 (2027-02-01)

Who's on this project

The award holder decides its own bids and subcontracts.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 5 mo

    Planned completionPlanned

  2. Today

    Provisional

    Last material change Sep 17, 2026.

  3. 7 mo ago

    Planned startPlanned

Record quality

Sources cited
1
Summary
From published records
Source as of
Last material change

Record details

NTIA NTIA federal reporting

Official project code
CM61-BEAD-OK-157-3159Official project code · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159
Project state or territory
OklahomaProject state or territory · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159
Reported award
Not reportedReported award · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159Reporting period: 2026-04-13
Planned service locations
Not reportedPlanned service locations · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159Reporting period: 2026-04-13
Recorded deployment technologies
Fixed WirelessRecorded deployment technologies · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159
Project award status
ProvisionalProject award status · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159
Planned start
2026-02-01Planned start · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159Planned date — not evidence that work occurred.
Planned completion
2027-02-01Planned completion · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159Planned date — not evidence that work occurred.

Description supplied by the source

This project is part of AtLink’s set of BEAD applications consisting of both fiber and licensed fixed-wireless buildouts. AtLink is Oklahoma’s largest fixed wireless provider and also operates an existing fiber network. With 20 years experience, the AtLink team is ready and able to successfully implement BEAD network build outs in an efficient manner to provide high-speed, affordable broadband to unserved and underserved locations in Oklahoma. \\n\\nThis project represents AtLink's deployed towers across Oklahoma. We are submitting this as an opportunity for the state to leverage our deployed assets with nominal cost to connect a large number of BSLs. This project will utilize fixed wireless as the last mile connectivity solution. Last mile connectivity for fixed wireless locations will be delivered by best-in-class Tarana G1 ngFWA platform capable of delivering up to 800 Mbps service with latency below 100 ms. Tarana’s G1 platform is designed specifically to ensure robust connectivity and capacity even in noisy wireless environments by leveraging active beamforming, null-forming and burst interference cancellation technologies at both ends of the link in licensed-by-rule CBRS (3.5Ghz) spectrum and unlicensed spectrum in the 5 GHz and 6 GHz bands. These characteristics address the technical and operational constraints that hindered unlicensed fixed wireless (ULFW) networks as a class in the past and is in fact the model for the mitigation strategies set forth in Appendix A of NTIA’s June 6, 2025, Restructuring Policy Notice. \\n\\nVertical assets in this network will be serviced by XGS-PON (10-Gigabit Symmetrical Passive Optical Network) technology. This architecture inherently supports scalability by allowing significant capacity upgrades without requiring extensive physical infrastructure changes, including upgrades to 50G-PON if necessary. In addition, AtLinkt will utilize licensed microwave radio backhaul if fiber is unavailable or infeasible to deploy, and as backup backhaul where necessary. Wireless backhaul will primarily utilize E band radios capable of speeds of up to 20 Gbps per radio, and the ability to attach multiple radios at the same location to increase capacity in the future as needed.\\n\\nAtLink will offer broadband internet services at competitive prices, with typical speeds ranging from 100 Mbps down / 20 Mbps up for the low-cost broadband service option up to 400 Mbps down / 100 Mbps up for AtLink’s current highest tier, with the ability to offer up to 500 Mbps symmetrical service.  \\n\\nThis proposal will deliver service to 100% of the unserved and underserved locations and CAIs. AtLink also will deploy private capital to serve “served” locations that are incidentally passed by the project network, bolstering the economics of the project. AtLink assumes a conservative take rate of 15% for unserved and underserved locations, and a take rate of 5% for “served” locations.  In addition, as described elsewhere in this application, AtLink will ensure 1 Gbps connectivity to CAIs with dedicated Tarana deployments, dedicated point-to-point microwave connections, or XGS-PON technology as needed.\\n\\nAtLink expects to be able to complete the project in less than 24 months, from the day a subrecipient agreement is signed to the day the project is closed out.  \\n\\nAtLink’s proposed project can easily scale speeds over time to meet the evolving connectivity needs of households and businesses and

Description supplied by the source · NTIA federal reportingNTIA dashboard extractAs of Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159

Sources, method and limits

Show 1 sourceHide

Sources and evidence

  1. NTIA
    NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-157-3159

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
  • Historical record: this entity is absent from the selected source snapshot. Check the dated source for current status.

Cite or correct this record

Kapwork Grow, “AtLink Services, LLC · Oklahoma”, https://kapwork.com/grow/directory/bead/projects/atlink-services-atlink-1000-pr_b076f530919de7d10ac2, materially updated Sep 17, 2026.

Report an error in this record and we will check it against the cited sources.

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

Related records

Kapwork Grow

Every BEAD award in the directory, in one place.

Search by trade, company or place.

Browse the directory