Aligned is building a 264 MW data center in Frederick County, Maryland (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 264 MW
- Investment
- $6
- Building area
- 1.6M sq ft (1,599,000 sq ft)
- Expected completion
- 2028
- IT load
- 264 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Aligned builds
Operator
Aligned
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 yr
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 2 yr ago
Construction start
- 4 yr ago
Announced
Reported updates without an event date
Reported for 2028.
Event date: Not reported · First observed: Not reported
Reported for 2024.
Event date: Not reported · First observed: Not reported
Reported for 2022.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Approximate: city centroid
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Aligned
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 264 MW
- Reported IT load
- 264 MW
- Reported investment
- $6
- Reported building area
- 1,599,000 sq ft
Reported dates
- Announced
- 2022
- Construction start reported
- 2024
- Expected completion
- 2028
Site
- City
- Adamstown
- County
- Frederick County
- State
- Maryland
- Location precision
- Approximate: city centroid
Permits and public records
- Incentives reported
- Sales Tax Exemption
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | Aligned Data Centers - Critical Digital Infrastructure Facility | Under construction | 264 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0225
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 67465838425281
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Aligned Data Centers - Critical Digital Infrastructure Facility”, https://kapwork.com/grow/directory/datacenters/aligned-data-centers-critical-digital-infrastructure-facility-md-dc_3d5c1d5574c1, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.