Skip to content
Data center buildUnder construction

Aligned CMH-02 Conesville Data Center Campus

AlignedConesville, Coshocton County, OHUpdated

Aligned is building a 600 MW data center in Coshocton County, Ohio (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
600 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. ~2 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
AlignedOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987
Stage
Under constructionStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 100408641090452

Scale

Reported capacity
600 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987

Reported dates

Announced
2024-11Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987

Site

City
ConesvilleCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987
County
Coshocton CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987
State
OhioState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0987
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 100408641090452

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 100408641090452

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryAligned CMH-02 Conesville Data Center CampusUnder construction600 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0987
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Aligned CMH-02 Conesville Data Center Campus”, https://kapwork.com/grow/directory/datacenters/aligned-cmh-02-conesville-data-center-campus-oh-dc_5b5235627394, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds