Antelope Data Center (Project Antelope)
Pronghorn Development LLC has approval for a 1500 MW data center in Iron County, Utah (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 1500 MW
- Investment
- $30B
- Building area
- 6.75M sq ft (6,750,000 sq ft)
- Site
- 640 acres
- Expected completion
- 2033
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Pronghorn Development LLC
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 7 yr
Expected completionPlanned
- Today
Approved
Last material change Sep 24, 2026.
- 3 mo ago
Announced
- 3 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2033.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Pronghorn Development LLC
- Stage
- Approved
- Facility type
- AI data center
Scale
- Reported capacity
- 1500 MW
- Reported investment
- $30B
- Reported building area
- 6,750,000 sq ft
- Site area
- 640 acres
- Reported jobs
- 1,800
Reported dates
- Announced
- 2026-06-04Reported date — see the source for the event evidenced.
- Expected completion
- 2033
Site
- City
- Cedar City
- County
- Iron
- State
- Utah
- Location precision
- Street address reported
Power and cooling
- Power source
- On-site natural gas generation
- Cooling
- Closed loop
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Antelope Data Center (Project Antelope) | Approved | 1500 MW |
| Server Country | Antelope Data Center | Proposed | 1500 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 4, 2026 · Record: pronghorn-antelope-cedar-city-ut
- CASt. George News (cited by Compute Atlas)As of: Aug 25, 2026
- CAIron County, Utah (cited by Compute Atlas)As of: Aug 25, 2026
- CAKSL.com (cited by Compute Atlas)As of: Sep 1, 2026
- CAIron County (cited by Compute Atlas)As of: Sep 4, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0628
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 193000236107680
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Antelope Data Center (Project Antelope)”, https://kapwork.com/grow/directory/datacenters/antelope-data-center-project-antelope-ut-dc_af885e83c7a0, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.