BluSky AI Inc. has proposed a 9.3 MW data center in Beaver County, Utah (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 9.3 MW
- Site
- 52 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other BluSky AI Inc. builds
Operator
BluSky AI Inc.
Utility
grid-interconnected power assigned via Digital Asset Management, LLC
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 14 mo ago
Announced
- 14 mo ago
Event date: · First observed: Not reported
- 15 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- BluSky AI Inc.
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 9.3 MW
- Site area
- 52 acres
Reported dates
- Announced
- 2025-07-08Reported date — see the source for the event evidenced.
Site
- City
- Milford
- County
- Beaver
- State
- Utah
- Location precision
- Street address reported
Power and cooling
- Utility
- grid-interconnected power assigned via Digital Asset Management, LLC
- Power source
- Grid power
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | BluSky AI Milford Campus | Proposed | 9.3 MW |
| Server Country | BluSky AI Milford Campus | Proposed | 9.3 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 5, 2026 · Record: blusky-ai-milford-ut
- CAGlobeNewswire (via Manila Times) (cited by Compute Atlas)As of: Aug 25, 2026
- CAU.S. Securities and Exchange Commission (EDGAR) (cited by Compute Atlas)As of: Sep 5, 2026
- CAU.S. Securities and Exchange Commission (EDGAR) (cited by Compute Atlas)As of: Sep 5, 2026
- CAMilford City (cited by Compute Atlas)As of: Sep 5, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 1029
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 280006607245111
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “BluSky AI Milford Campus”, https://kapwork.com/grow/directory/datacenters/blusky-ai-milford-campus-ut-dc_feaa1e5c0f37, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.