Skip to content
Data center buildProposed2 of 2 datasets agree

BluSky AI Milford Campus

BluSky AI Inc.Milford, Beaver County, UTUpdated

BluSky AI Inc. has proposed a 9.3 MW data center in Beaver County, Utah (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
9.3 MW
Site
52 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 14 mo ago

    Announced

  3. 14 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  4. 15 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
2, all agree
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
BluSky AI Inc.Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 5, 2026 · Record: blusky-ai-milford-utOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 5, 2026 · Record: blusky-ai-milford-utStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280006607245111

Scale

Reported capacity
9.3 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 5, 2026 · Record: blusky-ai-milford-utReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029
Site area
52 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280006607245111

Reported dates

Announced
2025-07-08Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029Reported date — see the source for the event evidenced.

Site

City
MilfordCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 5, 2026 · Record: blusky-ai-milford-utCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029
County
BeaverCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 5, 2026 · Record: blusky-ai-milford-utCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029
State
UtahState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 5, 2026 · Record: blusky-ai-milford-utState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 1029
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280006607245111

Power and cooling

Utility
grid-interconnected power assigned via Digital Asset Management, LLCUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280006607245111
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280006607245111
AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280006607245111

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasBluSky AI Milford CampusProposed9.3 MW
Server CountryBluSky AI Milford CampusProposed9.3 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 5, 2026 · Record: blusky-ai-milford-ut
  2. CA
  3. CA
  4. CA
  5. CA
  6. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 1029
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “BluSky AI Milford Campus”, https://kapwork.com/grow/directory/datacenters/blusky-ai-milford-campus-ut-dc_feaa1e5c0f37, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds