Avondale Campus
Prime Data Centers is building a 240 MW data center in Maricopa County, Arizona (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 240 MW
- Investment
- $3B
- Site
- 67 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Prime Data Centers builds
Operator
Prime Data Centers
Utility
Salt River Project (SRP)
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 4 mo ago
Announced
- 4 mo ago
Construction start
Reported updates without an event date
Reported for 2026-05.
Event date: Not reported · First observed: Not reported
Reported for 2026-05.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Prime Data Centers
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 240 MW
- Reported investment
- $3B
- Site area
- 67 acres
Reported dates
- Announced
- 2026-05
- Construction start reported
- 2026-05
Site
- City
- Avondale
- County
- Maricopa
- State
- Arizona
- Location precision
- Street address reported
Power and cooling
- Utility
- Salt River Project (SRP)
- Power source
- Grid power
- Cooling
- Closed loop
Sources, method and limits
Show 3 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Avondale Campus | Under construction | 240 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 10, 2026 · Record: prime-avondale-az
- CAPrime Data Centers (cited by Compute Atlas)As of: Sep 10, 2026
- CAReport cited by Compute AtlasAs of: Aug 31, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 264123729162063
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Avondale Campus”, https://kapwork.com/grow/directory/datacenters/avondale-campus-az-dc_f038190daf4f, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.