Skip to content
Data center buildUnder construction

Prime Data Centers Phoenix Campus

Prime Data CentersAvondale, Maricopa County, AZUpdated

Prime Data Centers is building a 210 MW data center in Maricopa County, Arizona (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
210 MW
Investment
$3B
Building area
1.3M sq ft (1,300,000 sq ft)
IT load
240 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. ~3 yr ago

    Announced

  3. 3 yr ago

    Construction start

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
Prime Data CentersOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
Stage
Under constructionStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 144300539627004

Scale

Reported capacity
210 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
Reported IT load
240 MWReported IT load · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 144300539627004
Reported investment
$3BReported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 144300539627004
Reported building area
1,300,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 144300539627004

Reported dates

Announced
2023-05Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
Construction start reported
2023Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027

Site

City
AvondaleCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
County
Maricopa CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
State
ArizonaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0027
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 144300539627004

Permits and public records

Incentives reported
Sales Tax ExemptionIncentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 144300539627004

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryPrime Data Centers Phoenix CampusUnder construction210 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0027
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Prime Data Centers Phoenix Campus”, https://kapwork.com/grow/directory/datacenters/prime-data-centers-phoenix-campus-az-dc_833d9667c5fc, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds