Prime ORD Chicago Campus
Prime Data Centers is building a 175 MW data center in Cook County, Illinois (under construction). 3 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 175 MW
- Investment
- $1B
- Building area
- 384,000 sq ft
- Expected completion
- Jun 2027 (2027-06)
- IT load
- 270 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Prime Data Centers builds
Operator
Prime Data Centers
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 9 mo
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- ~4 yr ago
Event date: · First observed: Not reported
- ~4 yr ago
Announced
- ~4 yr ago
Construction start
Reported updates without an event date
Reported for 2027-06.
Event date: Not reported · First observed: Not reported
Reported for 2023.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 3, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryEPA EPA facility registryKW Kapwork Grow tracker record
Status
- Operator
- Prime Data Centers
- Tenants
- CoreWeave
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 175 MW
- Reported IT load
- 270 MW
- Reported investment
- $1B
- Reported building area
- 384,000 sq ft
- Reported jobs
- 10
Reported dates
- Announced
- 2022-11-15Reported date — see the source for the event evidenced.
- Construction start reported
- 2022-11-15Reported date — see the source for the event evidenced.
- Expected completion
- 2027-06
Site
- City
- Elk Grove Village
- County
- Cook
- State
- Illinois
- Location precision
- Site footprint confirmed
Permits and public records
- EPA air permit
- Minor Emissions
- EPA compliance status
- No Violation Identified
- Incentives reported
- Tif; Infrastructure Support
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Prime ORD Chicago Campus | Under construction | 175 MW |
| Server Country | Prime Data Centers - Chicago ORD Campus | Operating | 175 MW |
| EPA ECHO | Prime Data Centers | Operating | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 10, 2026 · Record: prime-ord-elk-grove-village-il
- CAPrime Data Centers via PR Newswire (cited by Compute Atlas)As of: Sep 10, 2026
- CAPrime Data Centers (cited by Compute Atlas)As of: Aug 31, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0154
- EPAEPA Facility Registry (ECHO) record (US government, public domain)As of: Sep 24, 2026 · Record: 110071876308
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 77090261151080
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0) · US EPA Facility Registry Service via ECHO (public domain). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Prime ORD Chicago Campus”, https://kapwork.com/grow/directory/datacenters/prime-ord-chicago-campus-il-dc_461cf9a1ad68, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.