Skip to content
Data center buildProposed

Bermuda Hundred Data Center (Old Bermuda Hundred Road)

Undisclosed (landowner: Washington Single Family Fund3)Chester, Chesterfield County, VAUpdated

Undisclosed (landowner: Washington Single Family Fund3) has proposed a data center in Chesterfield County, Virginia (proposed). One source reports this facility in the Kapwork Grow tracker.

Site
89 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Undisclosed (landowner: Washington Single Family Fund3)

  • Utility

    Dominion Energy Virginia

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 2 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Undisclosed (landowner: Washington Single Family Fund3)Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: bermuda-hundred-data-center-chesterfield-va
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: bermuda-hundred-data-center-chesterfield-va
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 244441325085521

Scale

Site area
89 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 244441325085521

Site

City
ChesterCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: bermuda-hundred-data-center-chesterfield-va
County
ChesterfieldCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: bermuda-hundred-data-center-chesterfield-va
State
VirginiaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: bermuda-hundred-data-center-chesterfield-va
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 244441325085521
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 244441325085521

Power and cooling

Utility
Dominion Energy VirginiaUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 244441325085521

Sources, method and limits

Show 7 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasBermuda Hundred Data Center (Old Bermuda Hundred Road)ProposedNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 23, 2026 · Record: bermuda-hundred-data-center-chesterfield-va
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Bermuda Hundred Data Center (Old Bermuda Hundred Road)”, https://kapwork.com/grow/directory/datacenters/bermuda-hundred-data-center-old-bermuda-hundred-road-va-dc_de516e59a351, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds