Bull Church Data Center
NRD Retail, LLC has proposed a data center in Caroline County, Virginia (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Site
- 88 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
NRD Retail, LLC
Utility
Rappahannock Electric Co-op
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- ~1 yr ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- NRD Retail, LLC
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Site area
- 88 acres
Site
- City
- Ruther Glen
- County
- Caroline
- State
- Virginia
- Location precision
- Street address reported
Power and cooling
- Utility
- Rappahannock Electric Co-op
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Bull Church Data Center | Proposed | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 23, 2026 · Record: bull-church-data-center-caroline-va
- CA
- CAFredericksburg Free Press (cited by Compute Atlas)As of: Jul 17, 2026
- CAOak Ridge National Laboratory (ORNL) / HIFLD (cited by Compute Atlas)As of: Jul 23, 2026
- PEPublic Evidence Project: Permit from Caroline County, VA Department of Planning and Community DevelopmentAs of: Aug 6, 2026 · Record: source-bull-church-data-center-caroline-va
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 41085433278049
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Bull Church Data Center”, https://kapwork.com/grow/directory/datacenters/bull-church-data-center-va-dc_255df2a7ee61, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.