Data center buildProposed

COPT Defense Properties - Van Meter Campus

COPT Defense PropertiesVan Meter, Dallas County, IAUpdated

COPT Defense Properties has proposed a 1000 MW data center in Dallas County, Iowa (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
1000 MW
Investment
$3 ($3.2)
Building area
3.3M sq ft (3,300,000 sq ft)

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. ~2 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
COPT Defense PropertiesOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188
Tenants
Fortune 100 cloud computing tenantTenants · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 85823831766885
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 85823831766885

Scale

Reported capacity
1000 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188
Reported investment
$3.2Reported investment · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 85823831766885
Reported building area
3,300,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 85823831766885

Reported dates

Announced
2024-10Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188

Site

City
Van MeterCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188
County
Dallas CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188
State
IowaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0188
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 85823831766885

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryCOPT Defense Properties - Van Meter CampusProposed1000 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0188
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “COPT Defense Properties - Van Meter Campus”, https://kapwork.com/grow/directory/datacenters/copt-defense-properties-van-meter-campus-ia-dc_4e0e6b017765, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.