Edged Council Bluffs Data Center Campus (Project Lola)
Edged is building a 200 MW data center in Pottawattamie County, Iowa (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 200 MW
- Investment
- $1.4B
- Building area
- 570,890 sq ft
- Expected completion
- Oct 2027 (2027-10)
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Edged builds
Operator
Edged
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 13 mo
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 24 days ago
Construction start
- 24 days ago
Event date: · First observed: Not reported
- 11 mo ago
Event date: · First observed: Not reported
- 11 mo ago
Announced
Reported updates without an event date
Reported for 2027-10.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Edged
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported capacity
- 200 MW
- Reported investment
- $1.4B
- Reported building area
- 570,890 sq ft
Reported dates
- Announced
- 2025-10
- Construction start reported
- 2026-09-04Reported date — see the source for the event evidenced.
- Expected completion
- 2027-10
Site
- City
- Council Bluffs
- County
- Pottawattamie
- State
- Iowa
- Location precision
- Street address reported
Permits and public records
- Incentives reported
- Other
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Edged Council Bluffs Data Center Campus (Project Lola) | Under construction | Not reported |
| Server Country | Edged - Council Bluffs Campus (EDC Omaha) | Under construction | 200 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 4, 2026 · Record: edged-council-bluffs-ia
- CA3 News Now (KMTV) (cited by Compute Atlas)As of: Sep 4, 2026
- CABaxtel (cited by Compute Atlas)As of: Sep 4, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0190
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 129272607883567
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Edged Council Bluffs Data Center Campus (Project Lola)”, https://kapwork.com/grow/directory/datacenters/edged-council-bluffs-data-center-campus-project-lola-ia-dc_75929fdf412f, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.