Applied Digital Adair County Data Center
Applied Digital has proposed a 200 MW data center in Adair County, Iowa (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 200 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Applied Digital builds
Operator
Applied Digital
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- ~2 yr ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Applied Digital
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 200 MW
Site
- City
- Adair
- County
- Adair
- State
- Iowa
- Location precision
- Street address reported
- Community response
- Local opposition reported
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 3 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Applied Digital Adair County Data Center | Proposed | 200 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 4, 2026 · Record: applied-digital-adair-ia
- CAWestern Iowa Today (KSOM/KS 95.7) (cited by Compute Atlas)As of: Sep 4, 2026
- CACleanview (cited by Compute Atlas)As of: Sep 4, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 267989429312361
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Applied Digital Adair County Data Center”, https://kapwork.com/grow/directory/datacenters/applied-digital-adair-county-data-center-ia-dc_f3bc26bcdb69, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.