Core Scientific Muskogee Campus
Core Scientific is building a 1000 MW data center in Muskogee County, Oklahoma (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1000 MW
- Investment
- $4B
- Site
- 250 acres
- Reported jobs
- 150
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Core Scientific builds
Operator
Core Scientific
Utility
OG&E (Oklahoma Gas & Electric)
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 2 mo ago
Construction start
Reported updates without an event date
Reported for 2026-07.
Event date: Not reported · First observed: Not reported
Reported for 2026-04.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Core Scientific
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 1000 MW
- Reported investment
- $4B
- Site area
- 250 acres
- Reported jobs
- 150
Reported dates
- Construction start reported
- 2026-07
Site
- City
- Muskogee
- County
- Muskogee
- State
- Oklahoma
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- OG&E (Oklahoma Gas & Electric)
- Power source
- Grid power
- AI workload
- Confirmed AI or machine-learning workload
Sources, method and limits
Show 6 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Core Scientific Muskogee Campus | Under construction | 1000 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: core-scientific-muskogee-ok
- CACore Scientific (investor release) (cited by Compute Atlas)As of: Sep 10, 2026
- CAReport cited by Compute AtlasAs of: Jul 24, 2026
- CABusiness Wire (cited by Compute Atlas)As of: Aug 6, 2026
- CABlockspace (cited by Compute Atlas)As of: Aug 6, 2026
- CACore Scientific (cited by Compute Atlas)As of: Sep 14, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 196299515704153
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Core Scientific Muskogee Campus”, https://kapwork.com/grow/directory/datacenters/core-scientific-muskogee-campus-ok-dc_b2888ae73359, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.