CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center
Core Scientific is building a data center in Whitfield County, Georgia (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Investment
- $1.2B
- Site
- 173 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Core Scientific builds
Operator
Core Scientific
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 3 mo ago
Construction start
- 3 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasEPA EPA facility registryKW Kapwork Grow tracker record
Status
- Operator
- Core Scientific
- Stage
- Under construction
- Facility type
- Enterprise
Scale
- Reported investment
- $1.2B
- Site area
- 173 acres
Reported dates
- Construction start reported
- 2026-06-04Reported date — see the source for the event evidenced.
Site
- City
- Dalton
- County
- Whitfield
- State
- Georgia
- Location precision
- Site footprint confirmed
Permits and public records
- EPA air permit
- Synthetic Minor Emissions
- EPA compliance status
- No Violation Identified
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center | Under construction | Not reported |
| EPA ECHO | Core Scientific-dalton 4 Enterprise Drive | Operating | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 18, 2026 · Record: coreweave-dalton-ii-old-tilton-road-whitfield-ga
- CADalton Daily Citizen (cited by Compute Atlas)As of: Jul 17, 2026
- CADalton Daily Citizen (cited by Compute Atlas)As of: Jul 17, 2026
- CADalton Daily Citizen (cited by Compute Atlas)As of: Jul 17, 2026
- CANewsChannel 9 (cited by Compute Atlas)As of: Jul 17, 2026
- CAReport cited by Compute AtlasAs of: Jul 18, 2026
- EPAEPA Facility Registry (ECHO) record (US government, public domain)As of: Sep 24, 2026 · Record: 110072245707
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 212202371529310
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · US EPA Facility Registry Service via ECHO (public domain). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center”, https://kapwork.com/grow/directory/datacenters/coreweave-dalton-ii-core-scientific-old-tilton-road-data-center-ga-dc_c0ff36f9ba5e, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.