Core Scientific Pecos AI Campus

Core ScientificPecos, Reeves County, TXUpdated

Core Scientific is building a 1500 MW data center in Reeves County, Texas (under construction). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
1500 MW
Building area
125,000 sq ft
Expected completion
2027
IT load
1000 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. next year

    Expected completionPlanned

  2. this year

    Construction start

  3. Today

    Under construction

    Last material change Sep 24, 2026.

  4. 5 mo ago

    Announced

  5. 5 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
2, figures differ
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Core ScientificOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-txOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-tx
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 231357054108085

Scale

Reported capacity
1500 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-txReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595
Reported IT load
1000 MWReported IT load · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 231357054108085
Reported building area
125,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 231357054108085

Reported dates

Announced
2026-04-27Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595Reported date — see the source for the event evidenced.
Construction start reported
2026Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-tx
Expected completion
2027Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595

Site

City
PecosCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-txCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595
County
ReevesCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-txCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-txState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0595
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 231357054108085

Power and cooling

Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 231357054108085
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 8, 2026 · Record: core-scientific-pecos-tx

Permits and public records

Incentives reported
Sales Tax ExemptionIncentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 231357054108085

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasCore Scientific Pecos AI CampusUnder construction1500 MW
Server CountryCore Scientific Pecos AI/HPC Campus ExpansionExpanding1500 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 8, 2026 · Record: core-scientific-pecos-tx
  2. CA
  3. CA
  4. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0595
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Core Scientific Pecos AI Campus”, https://kapwork.com/grow/directory/datacenters/core-scientific-pecos-ai-campus-tx-dc_d26b0306c1b5, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.