CoreSite Bowers Data Center
CoreSite has approval for a 72 MW data center in Santa Clara County, California (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 72 MW
- Site
- 5 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other CoreSite builds
Operator
CoreSite
Utility
Silicon Valley Power (SVP)
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Approved
Last material change Sep 24, 2026.
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2024-08.
Event date: Not reported · First observed: Not reported
Reported for 2021-01.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasPE Public Evidence ProjectKW Kapwork Grow tracker record
Status
- Operator
- CoreSite
- Stage
- Approved
- Facility type
- AI data center
Scale
- Reported capacity
- 72 MW
- Site area
- 5 acres
Reported dates
- Announced
- 2024-08
Site
- City
- Santa Clara
- County
- Santa Clara
- State
- California
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- Silicon Valley Power (SVP)
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- Government records on file
- 1
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | CoreSite Bowers Data Center | Approved | 72 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: coresite-bowers-santa-clara-ca
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 6, 2026
- CACity of Santa Clara (cited by Compute Atlas)As of: Jul 6, 2026
- CACalifornia Energy Commission (cited by Compute Atlas)As of: Sep 14, 2026
- CAHoodline (cited by Compute Atlas)As of: Sep 14, 2026
- CAOpenStreetMap contributors (cited by Compute Atlas)As of: Sep 14, 2026
- PEPublic Evidence Project: Permit from City of Santa ClaraAs of: Aug 6, 2026 · Record: source-coresite-bowers-santa-clara-ca
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 207649177652282
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Public Evidence Project, U.S. Data Center Public Records Dataset, https://publicevidence.org/data/national-data-center-public-records (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “CoreSite Bowers Data Center”, https://kapwork.com/grow/directory/datacenters/coresite-bowers-data-center-ca-dc_bcdb1778cc3a, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.