DartPoints Lexington Data Center Campus
DartPoints has proposed a 70 MW data center in Fayette County, Kentucky (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 70 MW
- Investment
- $29M
- Building area
- 343,000 sq ft
- Site
- 30 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other DartPoints builds
Operator
DartPoints
Utility
Kentucky Utilities (KU)
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 3 mo ago
Event date: · First observed: Not reported
- 4 mo ago
Announced
- 4 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- DartPoints
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 70 MW
- Reported investment
- $29M
- Reported building area
- 343,000 sq ft
- Site area
- 30 acres
Reported dates
- Announced
- 2026-05-27Reported date — see the source for the event evidenced.
Site
- City
- Lexington
- County
- Fayette
- State
- Kentucky
- Location precision
- Street address reported
Power and cooling
- Utility
- Kentucky Utilities (KU)
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | DartPoints Lexington Data Center Campus | Proposed | 70 MW |
| Server Country | DartPoints Lexington Data Center | Expanding | 70 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 15, 2026 · Record: dartpoints-lexington-fayette-ky
- CAPR Newswire (DartPoints) (cited by Compute Atlas)As of: Sep 15, 2026
- CAWEKU (cited by Compute Atlas)As of: Sep 15, 2026
- CASmiley Pete Publishing (cited by Compute Atlas)As of: Sep 15, 2026
- CAWKYT (cited by Compute Atlas)As of: Sep 15, 2026
- CAOpenStreetMap (cited by Compute Atlas)As of: Sep 15, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0934
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 64138738007946
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “DartPoints Lexington Data Center Campus”, https://kapwork.com/grow/directory/datacenters/dartpoints-lexington-data-center-campus-ky-dc_3a5576b1ff8a, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.