DataBank Project Indo
DataBank has proposed a 200 MW data center in Bartow County, Georgia (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 200 MW
- Investment
- $2.4B
- Building area
- 1 sq ft
- Site
- 69 acres
- Expected completion
- 2032
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other DataBank builds
Operator
DataBank
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 6 yr
Expected completionPlanned
- Today
Proposed
Last material change Sep 24, 2026.
- 3 mo ago
Announced
- 3 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2032.
Event date: Not reported · First observed: Not reported
Reported for 2026.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- DataBank
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 200 MW
- Reported investment
- $2.4B
- Reported building area
- 1 sq ft
- Site area
- 69 acres
- Reported jobs
- 60
Reported dates
- Announced
- 2026-06-19Reported date — see the source for the event evidenced.
- Expected completion
- 2032
Site
- City
- Cartersville
- County
- Bartow
- State
- Georgia
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | DataBank Project Indo | Proposed | 200 MW |
| Server Country | Project Indo | Proposed | 200 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: databank-indo-cartersville-ga
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0901
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 185786346392074
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “DataBank Project Indo”, https://kapwork.com/grow/directory/datacenters/databank-project-indo-ga-dc_a8f8c12e4a0a, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.