Data center buildUnder construction

DataBank Culpeper Campus

DataBankCulpeper, Culpeper County, VAUpdated

DataBank is building a 192 MW data center in Culpeper County, Virginia (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
192 MW
Building area
1.4M sq ft (1,400,000 sq ft)
Expected completion
2027
IT load
192 MW
Reported jobs
40

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. next year

    Expected completionPlanned

  2. Today

    Under construction

    Last material change Sep 24, 2026.

  3. last year

    Construction start

  4. 2 yr ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
DataBankOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
Stage
Under constructionStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232

Scale

Reported capacity
192 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
Reported IT load
192 MWReported IT load · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232
Reported building area
1,400,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232
Reported jobs
40Reported jobs · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232

Reported dates

Announced
2024Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
Construction start reported
2025Construction start reported · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
Expected completion
2027Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543

Site

City
CulpeperCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
County
Culpeper CountyCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
State
VirginiaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0543
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232

Permits and public records

Incentives reported
Property Tax Abatement; Sales Tax ExemptionIncentives reported · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 115353239282232

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryDataBank Culpeper CampusUnder construction192 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0543
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “DataBank Culpeper Campus”, https://kapwork.com/grow/directory/datacenters/databank-culpeper-campus-va-dc_68e9c4d9e238, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds