Red Oak Campus
DataBank is building a 480 MW data center in Ellis County, Texas (under construction). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 480 MW
- Investment
- $837M
- Building area
- 600,000 sq ft
- Site
- 292 acres
- Expected completion
- 2026
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other DataBank builds
Operator
DataBank
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- this year
Construction start
- this year
Expected completionPlanned
- Today
Under construction
Last material change Sep 24, 2026.
- 5 mo ago
Event date: · First observed: Not reported
- ~2 yr ago
Announced
Reported updates without an event date
Reported for 2026.
Event date: Not reported · First observed: Not reported
Reported for 2026.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- DataBank
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 480 MW
- Capacity as the sources range
- 180 to 480 MW
- Reported investment
- $837M
- Reported building area
- 600,000 sq ft
- Site area
- 292 acres
Reported dates
- Announced
- 2024-09-10Reported date — see the source for the event evidenced.
- Construction start reported
- 2026
- Expected completion
- 2026
Site
- City
- Red Oak
- County
- Ellis
- State
- Texas
- Location precision
- Street address reported
Power and cooling
- AI workload
- AI or machine-learning workload reported
Sources, method and limits
Show 7 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Red Oak Campus | Under construction | 480 MW |
| Server Country | DataBank South Dallas / Red Oak Campus | Under construction | 180 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 14, 2026 · Record: databank-red-oak-tx
- CADataBank (cited by Compute Atlas)As of: Sep 14, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- CADataBank (cited by Compute Atlas)As of: Sep 8, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0831
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 69570673599113
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Red Oak Campus”, https://kapwork.com/grow/directory/datacenters/red-oak-campus-tx-2-dc_3f462f496289, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.