Edged Prichard Data Center (Project Gateway)
Edged has proposed a 8 MW data center in Mobile County, Alabama (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 8 MW
- Investment
- $93M
- Building area
- 57,000 sq ft
- Reported jobs
- 20
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Edged builds
Operator
Edged
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 5 mo ago
Announced
- 5 mo ago
Event date: · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Edged
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 8 MW
- Reported investment
- $93M
- Reported building area
- 57,000 sq ft
- Reported jobs
- 20
Reported dates
- Announced
- 2026-04-07Reported date — see the source for the event evidenced.
Site
- City
- Prichard
- County
- Mobile
- State
- Alabama
- Location precision
- Street address reported
Power and cooling
- Cooling
- Closed loop
- AI workload
- Mixed use, AI among other workloads
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Edged Prichard Data Center (Project Gateway) | Proposed | 8 MW |
| Server Country | Edged Prichard Data Center | Proposed | 8 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 9, 2026 · Record: edged-gateway-prichard-al
- CAEdged US (cited by Compute Atlas)As of: Sep 9, 2026
- CAFOX10 News (WALA) (cited by Compute Atlas)As of: Sep 9, 2026
- CAOpenStreetMap / Nominatim (cited by Compute Atlas)As of: Sep 9, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0633
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 273744172983252
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Edged Prichard Data Center (Project Gateway)”, https://kapwork.com/grow/directory/datacenters/edged-prichard-data-center-project-gateway-al-dc_f8f80830a3d4, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.