Data center buildUnder construction

Energy Vault Snyder AI Campus

Energy Vault, Inc.Snyder, Scurry County, TXUpdated

Energy Vault, Inc. is building a 500 MW data center in Scurry County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
500 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Energy Vault, Inc.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. 2 mo ago

    Announced

  3. 2 mo ago

    Construction start

  4. 2 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  5. 2 mo ago

    Construction start reported

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Energy Vault, Inc.Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 11558050844335

Scale

Reported capacity
500 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx

Reported dates

Announced
2026-07-27Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-txReported date — see the source for the event evidenced.
Construction start reported
2026-07-27Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-txReported date — see the source for the event evidenced.

Site

City
SnyderCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx
County
ScurryCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 11558050844335

Power and cooling

AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx

Sources, method and limits

Show 2 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasEnergy Vault Snyder AI CampusUnder construction500 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 8, 2026 · Record: energy-vault-snyder-scurry-county-tx
  2. CA
  3. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Energy Vault Snyder AI Campus”, https://kapwork.com/grow/directory/datacenters/energy-vault-snyder-ai-campus-tx-dc_0a831183ceaf, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.