Florida Ecopark AI Data Center Campus
Stonebridge (via Florida Ecopark LLC; end tenant undisclosed) has proposed a 1200 MW data center in Polk County, Florida (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1200 MW
- Investment
- $2.6B
- Site
- 200 acres
- Reported jobs
- 450
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)
Utility
Duke Energy Florida
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Proposed
Last material change Sep 24, 2026.
- 5 mo ago
Event date: · First observed: Not reported
- 5 mo ago
Event date: · First observed: Not reported
- 5 mo ago
Event date: · First observed: Not reported
- 6 mo ago
Announced
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 1200 MW
- Reported investment
- $2.6B
- Site area
- 200 acres
- Reported jobs
- 450
Reported dates
- Announced
- 2026-03
Site
- City
- Fort Meade
- County
- Polk
- State
- Florida
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- Duke Energy Florida
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- 10-year property-tax abatement under a 20-year development agreement (reported ~$150M value, tied to ~$2.6B planned investment) (Fort Meade, FL)
Sources, method and limits
Show 5 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Florida Ecopark AI Data Center Campus | Proposed | 1200 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 6, 2026 · Record: stonebridge-fort-meade-fl
- CAWUSF (cited by Compute Atlas)As of: Jul 6, 2026
- CATampa Bay Times (cited by Compute Atlas)As of: Jul 6, 2026
- CAFOX 13 Tampa Bay (cited by Compute Atlas)As of: Jul 6, 2026
- CAPropmodo (cited by Compute Atlas)As of: Jul 6, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 270102684067378
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Florida Ecopark AI Data Center Campus”, https://kapwork.com/grow/directory/datacenters/florida-ecopark-ai-data-center-campus-fl-dc_f5a82e896632, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.