Gainesville Crossing Digital Campus (GCDC)
CorScale is building a 300 MW data center in Prince William County, Virginia (under construction). 3 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 300 MW
- Site
- 130 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other CorScale builds
Operator
CorScale
Utility
Dominion Energy
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- 4 yr ago
Construction start
Reported updates without an event date
Reported for 2022.
Event date: Not reported · First observed: Not reported
Reported for 2021.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 3, figures differ
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasEPA EPA facility registryUVA UVA DC-SENSEKW Kapwork Grow tracker record
Status
- Operator
- CorScale
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 300 MW
- Site area
- 130 acres
Reported dates
- Construction start reported
- 2022
Site
- City
- Gainesville
- County
- Prince William
- State
- Virginia
- Location precision
- Site footprint confirmed
- Community response
- Local opposition reported
Power and cooling
- Utility
- Dominion Energy
- Power source
- Grid power
- Cooling
- Air cooled
- AI workload
- Likely AI or machine-learning workload
Permits and public records
- EPA compliance status
- No Violation Identified
- Building footprint from satellite imagery
- 322,853 sq ft footprint, 1 floor, built 2021
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Gainesville Crossing Digital Campus (GCDC) | Under construction | 300 MW |
| EPA ECHO | Corscale Data Centers- Gcdc VA 1.2 | Operating | Not reported |
| UVA DC-SENSE | Hyperscale data center building | Operating | Not reported |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 30, 2026 · Record: corscale-gainesville-crossing-va
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 8, 2026
- CAWTOP (cited by Compute Atlas)As of: Jul 7, 2026
- CAAffinius Capital (cited by Compute Atlas)As of: Jul 8, 2026
- CACoalition to Protect Prince William County (cited by Compute Atlas)As of: Jul 8, 2026
- CAVirginia DEQ (cited by Compute Atlas)As of: Jul 30, 2026
- EPAEPA Facility Registry (ECHO) record (US government, public domain)As of: Sep 24, 2026 · Record: 110072236047
- UVAUVA DC-SENSE building record (CC0)As of: Sep 24, 2026 · Record: 0099
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 90941370137092
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · US EPA Facility Registry Service via ECHO (public domain) · University of Virginia DC-SENSE, https://doi.org/10.18130/V3/AYLB4S (CC0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Gainesville Crossing Digital Campus (GCDC)”, https://kapwork.com/grow/directory/datacenters/gainesville-crossing-digital-campus-gcdc-va-dc_52b5f00ffa04, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.