IREN Horizon — Childress, TX
IREN (Iris Energy) is building a 750 MW data center in Childress County, Texas (under construction). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 750 MW
- Site
- 576 acres
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other IREN (Iris Energy) builds
Operator
IREN (Iris Energy)
Utility
ERCOT
Timeline
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- Today
Under construction
Last material change Sep 24, 2026.
- last year
Announced
- last year
Construction start
Reported updates without an event date
Reported for 2025.
Event date: Not reported · First observed: Not reported
Reported for 2025.
Event date: Not reported · First observed: Not reported
Reported for 2025.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasKW Kapwork Grow tracker record
Status
- Operator
- IREN (Iris Energy)
- Stage
- Under construction
- Facility type
- AI data center
Scale
- Reported capacity
- 750 MW
- Site area
- 576 acres
Reported dates
- Announced
- 2025
- Construction start reported
- 2025
Site
- City
- Childress
- County
- Childress
- State
- Texas
- Location precision
- Site footprint confirmed
Power and cooling
- Utility
- ERCOT
- Power source
- Grid power
- Cooling
- Closed loop
- AI workload
- Confirmed AI or machine-learning workload
Permits and public records
- Incentives reported
- Iris Energy Reinvestment Zone No. 1 (Chapter 312 Texas Tax Code property-tax abatement) (Childress County, TX)
Sources, method and limits
Show 8 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | IREN Horizon — Childress, TX | Under construction | 750 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 25, 2026 · Record: iren-horizon-childress-tx
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAIREN (official) (cited by Compute Atlas)As of: Jul 7, 2026
- CAGlobeNewsWire (cited by Compute Atlas)As of: Jul 7, 2026
- CABaxtel (cited by Compute Atlas)As of: Jul 7, 2026
- CANewsChannel 10 (Amarillo) (cited by Compute Atlas)As of: Jul 7, 2026
- CAData Center Dynamics (cited by Compute Atlas)As of: Jul 7, 2026
- CAReport cited by Compute AtlasAs of: Jul 25, 2026
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 20032490383156
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “IREN Horizon — Childress, TX”, https://kapwork.com/grow/directory/datacenters/iren-horizon-childress-tx-tx-dc_12382d792734, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.