Data center buildUnder construction

Joule Energy and Data Center Campus

Joule Capital PartnersHolden, Millard County, UTUpdated

Joule Capital Partners is building a 4000 MW data center in Millard County, Utah (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
4000 MW
Site
4,000 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. 10 mo ago

    Construction start

  3. 11 mo ago

    Announced

Reported updates without an event date

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Joule Capital PartnersOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 5711067313554

Scale

Reported capacity
4000 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
Site area
4,000 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 5711067313554

Reported dates

Announced
2025-10Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
Construction start reported
2025-11Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut

Site

City
HoldenCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
County
MillardCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
State
UtahState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 5711067313554

Power and cooling

Utility
PacifiCorpUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 5711067313554
Power source
On-site natural gas generationPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 5711067313554
Cooling
Closed loopCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 5711067313554
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 4, 2026 · Record: joule-millard-county-ut

Sources, method and limits

Show 5 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasJoule Energy and Data Center CampusUnder construction4000 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 4, 2026 · Record: joule-millard-county-ut
  2. CA
  3. CA
  4. CA
  5. CA
  6. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Joule Energy and Data Center Campus”, https://kapwork.com/grow/directory/datacenters/joule-energy-and-data-center-campus-ut-dc_0531b6237592, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.