Skip to content
Data center buildUnder construction

Lambda Chicago EdgeConneX AI Factory

LambdaChicago, Cook County, ILUpdated

Lambda is building a 23 MW data center in Cook County, Illinois (under construction). One source reports this facility in the Kapwork Grow tracker.

Capacity
23 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Under construction

    Last material change Sep 24, 2026.

  2. 13 mo ago

    Announced

  3. 13 mo ago

    Construction start

  4. 13 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  5. 13 mo ago

    Construction start reported

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Site footprint confirmed
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
LambdaOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il
Stage
Under constructionStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 30853167376202

Scale

Reported capacity
23 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il

Reported dates

Announced
2025-08-21Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-ilReported date — see the source for the event evidenced.
Construction start reported
2025-08-21Construction start reported · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-ilReported date — see the source for the event evidenced.

Site

City
ChicagoCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il
County
CookCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il
State
IllinoisState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il
Location precision
Site footprint confirmedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 30853167376202

Power and cooling

Utility
ComEdUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 30853167376202
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 30853167376202
Cooling
HybridCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 30853167376202
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il

Sources, method and limits

Show 6 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasLambda Chicago EdgeConneX AI FactoryUnder construction23 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 23, 2026 · Record: lambda-chicago-edgeconnex-il
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Lambda Chicago EdgeConneX AI Factory”, https://kapwork.com/grow/directory/datacenters/lambda-chicago-edgeconnex-ai-factory-il-dc_1c0f9014e74a, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds