Skip to content
Data center buildApproved

LBB01 Data Center

LambdaTXUpdated

Lambda has approval for a data center in Texas (approved). One source reports this facility in the Kapwork Grow tracker.

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Approved

    Last material change Sep 24, 2026.

  2. 2 mo ago

    Announced

  3. 2 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
1
Summary
From published records
Source as of
Last material change

Site and infrastructure

TX Texas Comptroller data center listKW Kapwork Grow tracker record

Status

Operator
LambdaOperator · Texas Comptroller data center listTexas Comptroller qualifying data center registration (Texas public record)As of Jul 10, 2026 · Record: DC239012
Stage
ApprovedStage · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 223057329559831
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 223057329559831

Reported dates

Announced
2026-07-10Announced · Texas Comptroller data center listTexas Comptroller qualifying data center registration (Texas public record)As of Jul 10, 2026 · Record: DC239012Reported date — see the source for the event evidenced.

Site

State
TexasState · Texas Comptroller data center listTexas Comptroller qualifying data center registration (Texas public record)As of Jul 10, 2026 · Record: DC239012

Power and cooling

AI workload
AI or machine-learning workload reportedAI workload · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 223057329559831

Permits and public records

Texas Comptroller registration
DC239012, certified 2026-07-10Texas Comptroller registration · Texas Comptroller data center listTexas Comptroller qualifying data center registration (Texas public record)As of Jul 10, 2026 · Record: DC239012

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Texas ComptrollerLBB01 Data CenterRegistered, certified 2026-07-10Not reported

Sources and evidence

  1. TX
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Texas Comptroller of Public Accounts, data center lists (Texas public record). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “LBB01 Data Center”, https://kapwork.com/grow/directory/datacenters/lbb01-data-center-tx-dc_cade94e49917, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds