Data center buildProposed

Lightedge - Ames Aviation Way Edge Colocation Facility

LightedgeAmes, Story County, IAUpdated

Lightedge has proposed a 25 MW data center in Story County, Iowa (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
25 MW
Building area
100,000 sq ft
Expected completion
2036

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Lightedge

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. in 10 yr

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 3 mo ago

    Announced

  4. 3 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
1
Location
Approximate: city centroid
Summary
From published records
Source as of
Last material change

Site and infrastructure

SC Server CountryKW Kapwork Grow tracker record

Status

Operator
LightedgeOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924
Stage
ProposedStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 94105462235871

Scale

Reported capacity
25 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924
Reported building area
100,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 94105462235871

Reported dates

Announced
2026-06-18Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924Reported date — see the source for the event evidenced.
Expected completion
2036Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924

Site

City
AmesCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924
County
StoryCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924
State
IowaState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0924
Location precision
Approximate: city centroidLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 94105462235871

Sources, method and limits

Show 1 sourceHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Server CountryLightedge - Ames Aviation Way Edge Colocation FacilityProposed25 MW

Sources and evidence

  1. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0924
  2. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Lightedge - Ames Aviation Way Edge Colocation Facility”, https://kapwork.com/grow/directory/datacenters/lightedge-ames-aviation-way-edge-colocation-facility-ia-dc_5596a2a5e2df, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds