Metrobloks Liberty Campus
Metrobloks has proposed a 150 MW data center in Clay County, Missouri (proposed). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 150 MW
- Investment
- $1.4B
- Building area
- 568,800 sq ft
- Expected completion
- 2028
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Metrobloks builds
Operator
Metrobloks
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 2 yr
Expected completionPlanned
- Today
Proposed
Last material change Sep 24, 2026.
- 6 mo ago
Announced
- 6 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2028.
Event date: Not reported · First observed: Not reported
Reported for 2026.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, all agree
- Location
- Site footprint confirmed
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Metrobloks
- Stage
- Proposed
- Facility type
- AI data center
Scale
- Reported capacity
- 150 MW
- Reported investment
- $1.4B
- Reported building area
- 568,800 sq ft
Reported dates
- Announced
- 2026-03-24Reported date — see the source for the event evidenced.
- Expected completion
- 2028
Site
- City
- Liberty
- County
- Clay
- State
- Missouri
- Location precision
- Site footprint confirmed
Power and cooling
- Power source
- Grid power
- AI workload
- Likely AI or machine-learning workload
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Metrobloks Liberty Campus | Proposed | 150 MW |
| Server Country | Metrobloks Liberty Data Center Campus | Proposed | 150 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Jul 26, 2026 · Record: metrobloks-liberty-mo
- CAMetrobloks (cited by Compute Atlas)As of: Jul 7, 2026
- CAReport cited by Compute AtlasAs of: Jul 26, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0744
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 15204793493819
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Metrobloks Liberty Campus”, https://kapwork.com/grow/directory/datacenters/metrobloks-liberty-campus-mo-dc_0dd42450a93b, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.