Skip to content
Data center buildProposed

Poolside Project Horizon AI Campus

Poolside AIPecos County, TXUpdated

Poolside AI has proposed a 2000 MW data center in Pecos County, Texas (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
2000 MW
Site
568 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Poolside AI

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Poolside AIOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx
Facility type
AI data centerFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 211053577216971

Scale

Reported capacity
2000 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx
Site area
568 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 211053577216971

Site

County
PecosCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx
State
TexasState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 211053577216971

Power and cooling

Power source
On-site natural gas generationPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 211053577216971
AI workload
Confirmed AI or machine-learning workloadAI workload · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx

Sources, method and limits

Show 7 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasPoolside Project Horizon AI CampusProposed2000 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 8, 2026 · Record: poolside-project-horizon-pecos-county-tx
  2. CA
  3. CA
  4. CA
  5. CA
  6. CA
  7. CA
  8. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Poolside Project Horizon AI Campus”, https://kapwork.com/grow/directory/datacenters/poolside-project-horizon-ai-campus-tx-dc_bff3bd7fa3cb, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds