RadiusDC has proposed a 24 MW data center in Hendricks County, Indiana (proposed). One source reports this facility in the Kapwork Grow tracker.

Capacity
24 MW

Who's on this build

Named in the cited sources. No source reports who builds it.

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

Reported updates without an event date

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
RadiusDCOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 118200937476065

Scale

Reported capacity
24 MWReported capacity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in

Site

City
PlainfieldCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in
County
HendricksCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in
State
IndianaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 118200937476065

Power and cooling

Utility
Duke Energy IndianaUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 118200937476065
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 118200937476065

Sources, method and limits

Show 3 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasRadiusDC Plainfield Campus (Indy I / Indy II)Proposed24 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 13, 2026 · Record: radiusdc-plainfield-hendricks-county-in
  2. CA
  3. CA
  4. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “RadiusDC Plainfield Campus (Indy I / Indy II)”, https://kapwork.com/grow/directory/datacenters/radiusdc-plainfield-campus-indy-i-indy-ii-in-dc_6b80cce3efe1, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

More builds

Kapwork Grow

Every data center build in the directory, in one place.

Search by company, place or trade.

Browse all builds