River Run Energy Center Data Center Campus
Basin Electric Power Cooperative has proposed a 1450 MW data center in Mercer County, North Dakota (proposed). One source reports this facility in the Kapwork Grow tracker.
- Capacity
- 1450 MW
- Investment
- $18B
- Expected completion
- 2030
Who's on this build
Named in the cited sources. No source reports who builds it.
Operator
Basin Electric Power Cooperative
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- in 4 yr
Expected completionPlanned
- Today
Proposed
Last material change Sep 24, 2026.
- 9 mo ago
Announced
Reported updates without an event date
Reported for 2030.
Event date: Not reported · First observed: Not reported
Reported for 2025-12.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 1
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
SC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Basin Electric Power Cooperative
- Stage
- Proposed
- Facility type
- Enterprise
Scale
- Reported capacity
- 1450 MW
- Reported investment
- $18B
Reported dates
- Announced
- 2025-12
- Expected completion
- 2030
Site
- City
- Stanton area
- County
- Mercer County
- State
- North Dakota
Sources, method and limits
Show 1 sourceHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Server Country | River Run Energy Center Data Center Campus | Proposed | 1450 MW |
Sources and evidence
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0778
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 33400070761107
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “River Run Energy Center Data Center Campus”, https://kapwork.com/grow/directory/datacenters/river-run-energy-center-data-center-campus-nd-dc_1e608f5a6a93, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.