Data center buildProposed

Salix Data Center Site (Midwest Capital Group)

Midwest Capital Group (MidAmerican Energy)Salix, Woodbury County, IAUpdated

Midwest Capital Group (MidAmerican Energy) has proposed a data center in Woodbury County, Iowa (proposed). One source reports this facility in the Kapwork Grow tracker.

Site
900 acres

Who's on this build

Named in the cited sources. No source reports who builds it.

  • Operator

    Midwest Capital Group (MidAmerican Energy)

  • Utility

    MidAmerican Energy

Timeline

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. Today

    Proposed

    Last material change Sep 24, 2026.

  2. 1 mo ago

    Reported as announced

    Event date: · First observed: Not reported

  3. 3 mo ago

    Announced

  4. 3 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Record quality

Datasets
1
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasKW Kapwork Grow tracker record

Status

Operator
Midwest Capital Group (MidAmerican Energy)Operator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 14, 2026 · Record: salix-data-center-site-ia
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 14, 2026 · Record: salix-data-center-site-ia
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 277085714781231

Scale

Site area
900 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 277085714781231

Reported dates

Announced
2026-06-11Announced · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 14, 2026 · Record: salix-data-center-site-iaReported date — see the source for the event evidenced.

Site

City
SalixCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 14, 2026 · Record: salix-data-center-site-ia
County
WoodburyCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 14, 2026 · Record: salix-data-center-site-ia
State
IowaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Aug 14, 2026 · Record: salix-data-center-site-ia
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 277085714781231
Community response
Local opposition reportedCommunity response · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 277085714781231

Power and cooling

Utility
MidAmerican EnergyUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 277085714781231
Power source
Grid powerPower source · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 277085714781231

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasSalix Data Center Site (Midwest Capital Group)ProposedNot reported

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 14, 2026 · Record: salix-data-center-site-ia
  2. CA
  3. CA
  4. CA
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Salix Data Center Site (Midwest Capital Group)”, https://kapwork.com/grow/directory/datacenters/salix-data-center-site-midwest-capital-group-ia-dc_fc020b9a142f, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.