Sequitor Edge Kearney Data Center
Sequitor Edge has approval for a 4.99 MW data center in Buffalo County, Nebraska (approved). 2 sources report this facility in the Kapwork Grow tracker.
- Capacity
- 4.99 MW
- Building area
- 40,000 sq ft
- Site
- 16 acres
- Expected completion
- 2027
- IT load
- 3 MW
Who's on this build
Named in the cited sources. No source reports who builds it.
- Other Sequitor Edge builds
Operator
Sequitor Edge
Utility
Nebraska Public Power District
Schedule
Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.
- next year
Expected completionPlanned
- Today
Approved
Last material change Sep 24, 2026.
- 12 mo ago
Announced
- 12 mo ago
Event date: · First observed: Not reported
Reported updates without an event date
Reported for 2027.
Event date: Not reported · First observed: Not reported
Reported for 2024.
Event date: Not reported · First observed: Not reported
Record quality
- Datasets
- 2, figures differ
- Location
- Street address reported
- Summary
- From published records
- Source as of
- Last material change
Site and infrastructure
CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record
Status
- Operator
- Sequitor Edge
- Stage
- Approved
- Facility type
- Enterprise
Scale
- Reported capacity
- 4.99 MW
- Reported IT load
- 3 MW
- Reported building area
- 40,000 sq ft
- Site area
- 16 acres
Reported dates
- Announced
- 2025-09-19Reported date — see the source for the event evidenced.
- Expected completion
- 2027
Site
- City
- Kearney
- County
- Buffalo
- State
- Nebraska
- Location precision
- Street address reported
Power and cooling
- Utility
- Nebraska Public Power District
- Power source
- Grid power
Sources, method and limits
Show 4 sourcesHide
What each source reports
| Dataset | Reported name | Reported status | Reported MW |
|---|---|---|---|
| Compute Atlas | Sequitor Edge Kearney Data Center | Approved | Not reported |
| Server Country | Sequitor Edge Kearney Data Center | Proposed | 4.99 MW |
Sources and evidence
- CACompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Aug 21, 2026 · Record: sequitor-edge-kearney-ne
- CASequitor Edge (cited by Compute Atlas)As of: Aug 21, 2026
- CANews Channel Nebraska (cited by Compute Atlas)As of: Aug 21, 2026
- SCServer Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0296
- KWKapwork Grow tracker record, merged from the sources listed here (free account)As of: Sep 23, 2026 · Record: 33789771472122
Limitations and interpretation
- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.
Cite or correct this record
Kapwork Grow, “Sequitor Edge Kearney Data Center”, https://kapwork.com/grow/directory/datacenters/sequitor-edge-kearney-data-center-ne-dc_1ebb4b535cfa, materially updated Sep 24, 2026.
Report an error in this record and we will check it against the cited sources.
An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
More builds
Kapwork Grow
Every data center build in the directory, in one place.
Search by company, place or trade.