Sequitor Edge Rapid City

Sequitor EdgeRapid City, Pennington County, SDUpdated

Sequitor Edge has proposed a 15 MW data center in Pennington County, South Dakota (proposed). 2 sources report this facility in the Kapwork Grow tracker.

Capacity
15 MW
Building area
30,000 sq ft
Site
10 acres
Expected completion
2027

Who's on this build

Named in the cited sources. No source reports who builds it.

Schedule

Dates as reported. Not a bid calendar. A planned date is not evidence that work occurred.

  1. next year

    Expected completionPlanned

  2. Today

    Proposed

    Last material change Sep 24, 2026.

  3. 7 mo ago

    Announced

  4. 7 mo ago

    Reported as announced

    Event date: · First observed: Not reported

Reported updates without an event date

Record quality

Datasets
2, figures differ
Location
Street address reported
Summary
From published records
Source as of
Last material change

Site and infrastructure

CA Compute AtlasSC Server CountryKW Kapwork Grow tracker record

Status

Operator
Sequitor EdgeOperator · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: sequitor-edge-rapid-city-sdOperator · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824
Stage
ProposedStage · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: sequitor-edge-rapid-city-sdStage · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824
Facility type
EnterpriseFacility type · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280931450527504

Scale

Reported capacity
15 MWReported capacity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824
Reported building area
30,000 sq ftReported building area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280931450527504
Site area
10 acresSite area · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280931450527504

Reported dates

Announced
2026-02-11Announced · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824Reported date — see the source for the event evidenced.
Expected completion
2027Expected completion · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824

Site

City
Rapid CityCity · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: sequitor-edge-rapid-city-sdCity · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824
County
PenningtonCounty · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: sequitor-edge-rapid-city-sdCounty · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824
State
South DakotaState · Compute AtlasCompute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of Sep 13, 2026 · Record: sequitor-edge-rapid-city-sdState · Server CountryServer Country project record (CC BY 4.0)As of Sep 24, 2026 · Record: 0824
Location precision
Street address reportedLocation precision · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280931450527504

Power and cooling

Utility
Black Hills EnergyUtility · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280931450527504
Cooling
Closed loopCooling · Kapwork Grow tracker recordKapwork Grow tracker record, merged from the sources listed here (free account)As of Sep 23, 2026 · Record: 280931450527504

Sources, method and limits

Show 4 sourcesHide

What each source reports

What each source reports
DatasetReported nameReported statusReported MW
Compute AtlasSequitor Edge Rapid CityProposedNot reported
Server CountrySequitor Edge Rapid City Data CenterProposed15 MW

Sources and evidence

  1. CA
    Compute Atlas facility record (Kubiak, E., 2026, CC BY 4.0)As of: Sep 13, 2026 · Record: sequitor-edge-rapid-city-sd
  2. CA
  3. CA
  4. SC
    Server Country project record (CC BY 4.0)As of: Sep 24, 2026 · Record: 0824
  5. KW

Limitations and interpretation

  • This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-09-23. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
  • Sources on this record: Compute Atlas: Kubiak, E. (2026). Compute Atlas [Data set]. https://doi.org/10.5281/zenodo.22284476 (CC BY 4.0) · Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
  • An announced or permitted build is not a contract, an open bid or a purchase order.
  • Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

Cite or correct this record

Kapwork Grow, “Sequitor Edge Rapid City”, https://kapwork.com/grow/directory/datacenters/sequitor-edge-rapid-city-sd-dc_ff8173509f10, materially updated Sep 24, 2026.

Report an error in this record and we will check it against the cited sources.

An announced or permitted build is not a contract, an open bid or a purchase order. Capacity and dates are as reported by the cited sources. “Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.